From the Caspian to the Bosphorus: how to make transit successful

This is the third and final article analysing the World Bank report. It discusses how to turn the Middle Corridor from a transit route into a multiplier of economic growth for Kazakhstan.

From the Caspian to the Bosphorus: how to make transit successful

The Middle Corridor connects several railway networks, ports on two seas and the transport systems of different countries. Its capacity is determined not by average travel speeds but by what happens on its busiest sections and at interfaces between neighbouring operators. These questions become increasingly important as freight volumes grow.

The World Bank's report on the Trans-Caspian route treats infrastructure, climate and management challenges as interconnected. Falling Caspian Sea levels require a different fleet and continuous port adaptation. Congested sections need expansion. State-owned carriers need financial sustainability and better coordination. All participants also need comparable data, private sector involvement and a mechanism for implementing joint decisions.

The Caspian: adapting to new conditions

In 2025, the Caspian Sea reached a historic low of 29.6 metres below the Baltic height datum. The process has a long-term cause: the balance between river inflows and evaporation is changing. The Volga accounts for around 80% of inflow, while rising temperatures increase evaporation. A climate and hydrological model developed for the World Bank shows a trend towards further decline throughout the twenty-first century, although the rate and magnitude vary across scenarios.

For ports, this means changing operating conditions. Approach channels and berths are becoming shallower, and some vessels can no longer be fully loaded. Dredging is becoming a recurring expense rather than a one-off construction project. A shortage of suitable vessels raises freight costs and complicates ferry and container service schedules.

One response is to use a fleet designed for the shallow Caspian. The World Bank's underlying materials note agreements between Kazmortransflot and AD Ports to order two shallow-draught container ships with capacity exceeding 500 TEU, as well as plans to expand the ferry fleet. Implementing these plans matters not only in itself: new vessels must operate in conjunction with train schedules and terminal capacity.

The second factor is weather. According to the study, from January 2023 to September 2024, weather-related disruptions affected operations at Aktau Port for 18.8% of the time, equivalent to roughly two months a year; strong winds accounted for around 40% of these disruptions. The World Bank estimates that a five-day port closure would cost households in Central Asia and the South Caucasus nearly $30 million. Costs arise from cargo storage, alternative routes and higher final prices.

The Bank also assessed the impact of broader disruptions: a week-long closure of the most critical rail section could cost households in corridor countries up to $70 million, with exporters and trading partners outside the corridor potentially losing up to another $50 million. Losses are spread across several countries because the entire supply chain is disrupted. For Kazakhstan, this means considering not only its own weak points but also the resilience of neighbouring ports and railways.

Natural hazards are unevenly distributed along the corridor. Flooding and landslides are particularly significant in the South Caucasus, while Kazakhstan's railways face heat stress and possible speed restrictions during hot weather. Disruption at a single critical section may cause losses in other countries. Climate adaptation therefore requires joint plans, alternative routes and coordinated transport management during disruptions.

Four sections on which the entire chain depends

The World Bank identifies several critical points. They demonstrate why average infrastructure utilisation can be misleading.

Beyneu–Mangystau and access to Aktau. In 2023, the railway operated at 96% utilisation, with capacity of around 12 trains a day. Plans envisage increasing this to 18 by 2030. The neighbouring Shalkar–Beyneu section was at 78% utilisation. Port utilisation is similarly uneven: combined utilisation at Aktau and Kuryk in 2025 was 38%, while Aktau's container terminal operated at 93% capacity. Aktau's container throughput grew from 22,800 TEU in 2023 to 65,000 in 2025. Container infrastructure expansion must account for both water depths and fleet requirements.

Khorgos–Almaty. Traffic on this section already exceeds its calculated capacity, although the border crossing itself has comparatively short container transfer times between track gauges: around 2.6 hours compared with 6.3 hours at Dostyk. Projects to relieve congestion include a $315 million Almaty bypass and a $212 million upgrade of the Altynkol–Zhetygen line. World Bank scenario calculations envisage increasing capacity on the route to 60 trains a day by 2030.

Poti. In 2025, the Georgian port handled 636,500 TEU against capacity of around 650,000, or 98% utilisation. Batumi, meanwhile, had spare capacity. Poti's expansion and construction of the deep-water Anaklia port are under consideration. For Anaklia, a model involving several private operators is being considered. This is an example of how the corridor needs changes in port market organisation as well as construction.

The Bosphorus. Freight trains currently cross the strait through the Marmaray tunnel, designed primarily for passenger traffic. Freight trains have limited overnight slots. The World Bank estimates a theoretical ceiling of around 3 million tonnes per year, with actual capacity potentially lower under certain conditions. The separate $8.2 billion surface rail crossing, INRAIL, is scheduled to open in 2034. It is the largest project on the Bank's priority list.

These sections are in different countries and require different solutions. For the customer, however, they form a single chain. Its effectiveness depends on whether the entire route can handle cargo to a coordinated schedule, including transfers between sea and rail.

Railway companies: governance and financial sustainability

Most of the Middle Corridor's railway infrastructure belongs to state-owned companies. Their financial and management decisions therefore directly affect investment, service quality and the willingness of private capital to operate alongside them.

The World Bank compared five railway companies: KTZ and the railways of Georgia, Azerbaijan, Uzbekistan and Türkiye. It assessed corporate governance, cost and tariff transparency, asset utilisation, access to finance and regulatory independence. The Bank did not assign overall scores. In its qualitative assessment, KTZ and Georgian Railway had made more progress towards a commercial operating model than the other participants.

KTZ stands out for its scale, traffic density and asset management. According to the Bank, the company transports substantially more freight than the other railways examined combined and can already raise financing on commercial terms with support from international financial institutions. Tariffs remain a challenge: their structure does not sufficiently differentiate market segments and does not always cover costs. This complicates cash flow forecasting and investment appraisal.

The World Bank proposes three areas of change: professional and independent corporate governance while retaining state transport policy; financial sustainability through cost-reflective tariffs and transparent government contracts; and efficiency through asset management, data and coordinated transport planning. The authors do not prescribe a single privatisation or railway separation model. Different models may work in different countries, but clear rules and access to commercial financing matter in all of them.

Shared data as a prerequisite for investment

In 2022, the TITR Association estimated container traffic on the corridor at 33,600 TEU, the EBRD at 18,000 and the OECD at 50,000. The difference is nearly threefold. The World Bank notes that the discrepancies partly reflect which sections are counted, whether oil is included and whether actual data are compared with model estimates. Without a common methodology, figures from different publications cannot automatically be added or compared.

Another telling example concerns freight volumes across the Caspian. For 2023, the World Bank estimates total flows at 8.8 million tonnes, including around 5.3 million tonnes of oil. The preceding report used a different accounting structure. The apparent jump in totals between studies should therefore not be interpreted as a direct increase in freight volumes.

Why are common statistics needed? Investors assess demand for a terminal or vessel, carriers calculate turnaround times, and governments evaluate investment returns. If each participant uses its own definitions and reporting, decisions are harder to coordinate and verify. The World Bank proposes an independent corridor performance measurement function: open methodology and comparable data on volumes, delivery times, delays, tariffs and node utilisation. Commercially sensitive information can be aggregated.

This work need not be entrusted to a new organisation. The Bank identifies the TITR Association, universities and research centres as possible providers. What matters is not the data operator's status but the confidence that countries, businesses and international financial institutions have in its methodology.

How to turn coordination into implementation

The report lists 21 major structures involved in cooperation around the Trans-Caspian route. The sheer number of forums does not yet ensure joint decisions. The World Bank identifies three gaps: a lack of comparable data, insufficient private sector participation and the absence of a permanent mechanism under which corridor countries are accountable for implementing decisions.

These conclusions are supported by conversations with logistics companies and carriers in 2022–2025. Their statements are not a representative survey, but consistently point to a shared demand for predictable delivery times and rules, participation in discussions of projects and information about decisions made.

The World Bank proposes a three-part TARS mechanism (TCTC Assessment and Response Structure). The first element is the verifiable data system described above. The second is a private sector advisory committee in which businesses share information on demand and delays, and governments show how that information affects plans. The third is an intergovernmental forum for corridor countries to make regular decisions and monitor their implementation. There is no need to create dozens of new organisations: the proposal is to use existing structures and gradually develop common practices.

The Middle Corridor brings together engineering, commercial and public policy challenges. Construction removes capacity constraints; new vessels and port adaptation respond to changes in the Caspian; financially sustainable operators provide transport services; common statistics enable investment planning; and joint decisions make delivery times more predictable. The route's success will depend on whether these actions can proceed simultaneously and reinforce one another.

Based on: Alam M. M., Blancas L. C. Integration: World-Class Trade Logistics Along the Trans-Caspian Transport Corridor. World Bank, 2026. CC BY 3.0 IGO licence. The translation and interpretation were prepared by TALAP and are not official World Bank materials.