Kazakhstan occupies a central position on the Trans-Caspian route: the main overland flows pass through its railways, and in 2023 the country shipped 4.8 million tonnes of cargo across the Caspian. This accounts for more than half of the corridor's traffic. But freight volume alone does not determine the economic outcome. It depends on what a country produces, what cargo it ships, what services it provides and how many new businesses emerge around transport infrastructure.
In its new report, the World Bank assessed the economic impact of developing the Middle Corridor for nine countries. The model shows a long-term increase in Kazakhstan's GDP of 2.2%, or around $6.1 billion. For Türkiye, the projected increase is 4.1%, or $47.1 billion. The difference reflects the structure of the economies and investment on their territories. More importantly, the calculations help identify which decisions could turn the transport route into a stronger driver of Kazakhstan's development.
What the economic model shows
The World Bank used the GTAP general equilibrium model. It incorporates construction investment and lower transport costs, which affect prices, trade, output and employment. On average across nine countries, the long-term effect is estimated at a 3.3% increase in GDP, around $58 billion, and a 2.9% increase in employment.
This is a modelled increase in the level of GDP relative to a baseline scenario, not an additional annual growth rate, government revenue or the revenue of transport companies. The authors explicitly suggest using the results as an indication of orders of magnitude and differences between countries, rather than an exact forecast for a particular date. The model data are based on 2019, updated to 2023.
For Kazakhstan, employment is estimated to increase by 3.2%, above the corridor average. The country ranks second after Türkiye in absolute GDP gains and fifth in relative terms. Some smaller economies see larger percentage gains because improved transport connectivity has a greater effect on their trading conditions.
What lies behind Kazakhstan's 2.2%? Primarily two mechanisms: infrastructure construction and lower transport costs. According to the Bank's calculations, construction sector output increases by 8.6%. Kazakhstan's imports could rise by 3.1%, or $2.3 billion, including machinery and equipment. Exports could increase by 0.7%, or $612 million. Companies' logistics costs, currently around 17% of sales, could fall by 1.5 percentage points by 2040.
From the perspective of consumers and businesses, this is a significant result. Equipment, materials and finished goods become more affordable; construction generates orders; and trade expands. But the model's impact on Kazakh exports is more modest than its impact on imports. The reason lies in the structure of production.
Why the impact differs between Kazakhstan and Türkiye
Türkiye simultaneously invests in infrastructure, uses it for its own trade and produces goods sensitive to delivery costs and speed. It is home to the most expensive project on the World Bank's list: an $8.2 billion new rail crossing over the Bosphorus. Other major rail projects are also underway or planned there.
According to the report, about 94% of the projected freight flow through the new crossing, estimated at 36 million tonnes by 2040, would consist of Türkiye's own imports and exports, primarily trade with the European Union. For the country, it is not only part of international transit but also a solution to domestic transport constraints. Today, rail carries only 1–2 million tonnes annually between Türkiye and the EU, while the Kapıkule road border crossing serves around one million trucks.
The second factor is industrial structure. Machinery, vehicles and other products for which delivery times and logistics reliability matter account for a significant share of Turkish exports. Lower transport costs therefore support a broader production chain. Türkiye also manufactures equipment for the corridor itself: for example, state-owned TÜRASAŞ produces electric locomotives with high local content. Some investment returns to domestic industry in the form of orders.
Kazakhstan currently exports predominantly goods with different logistics economics. For oil, precious metals and various raw materials, container delivery speed has little effect on price or competitiveness. This does not make the corridor less important, but it explains why growing transit does not automatically translate into comparable growth in exports of processed goods.
The difference between the countries is not a judgement on the quality of their transport policies. It shows how broadly each economy can use infrastructure and retain related orders, services and production within the country.
Where Kazakhstan could gain additional benefits
The first opportunity concerns agricultural exports. The World Bank separately modelled the impact of lower logistics costs on food trade. A 5% reduction in such costs could yield an additional 2.9 million tonnes of agricultural exports across corridor countries, of which Kazakhstan would account for 2.3 million tonnes. With a more radical 50% reduction, the modelled increase for Kazakhstan reaches 11.9 million tonnes. These are sensitivity scenarios, not commitments by carriers or farmers. But they show how important accessible routes are for grain and food products.
The second opportunity concerns metal processing. Already, 38% of Kazakhstan's non-ferrous metal exports cross the Caspian. In 2021–2023, trade in ores in the region grew much faster than trade in processed metals. The World Bank estimates that regional non-ferrous metal flows could increase from 25 to 37 million tonnes by 2040. For Kazakhstan, the key question is what share of the future flow will be raw materials and what share will be higher-value-added products.
The third opportunity concerns production and services around the transport corridor itself. Growing traffic will require wagons, locomotives, vessels, terminals, warehouses, roads, repairs, digital systems and professional services. These orders can be met through imports or by developing domestic manufacturing and service supply chains.
Kazakhstan has such a base. It is home to EKZ with Alstom participation, a locomotive manufacturing company with Wabtec participation and five wagon manufacturing plants. The underlying review cites a $4.2 billion KTZ order for Wabtec locomotives to be delivered in 2027–2036. Assessing the impact of such projects requires consideration not only of procurement costs and freight volumes but also the availability of local suppliers, repair and maintenance services and workforce training. Shipbuilding development is being discussed on the Caspian. This does not guarantee that all new investment will remain within the domestic economy, but it creates an opportunity to localise some orders and train the specialists needed to fulfil them.
This is how a transport corridor becomes an economic corridor: countries gain not only a route for cargo, but new markets, jobs and businesses connected to transport infrastructure.
$55.6 billion: infrastructure and the economy around it
The World Bank divides the investment needed by 2040 into two layers.
The first comprises $25.1 billion of investment in core infrastructure. It includes 16 priority projects removing rail and port capacity constraints. Railways account for $22.5 billion. Most projects are already underway or scheduled to start soon, and regional freight demand makes them economically justified even without maximum growth in China–Europe transit.
The second comprises $30.5 billion of complementary investment: rolling stock renewal, the Caspian fleet, dry ports, logistics hubs, connecting roads and digital infrastructure. These investments are needed for the transport network to meet growing demand and enable businesses to develop activities around the corridor. Most of the relevant projects have not yet begun; cost estimates are preliminary and require feasibility studies.
The World Bank estimates that around 66% of the second layer, approximately $20 billion, is potentially open to private participation, mainly toll roads, equipment and rolling stock, terminals and hubs. This is not a confirmed amount of financing raised, but an estimate of investment opportunities subject to suitable regulatory conditions and risk allocation.
Kazakhstan accounts for around $7.53 billion in complementary investment, the second-highest figure among corridor countries. TALAP calculations based on World Bank data indicate that projects worth around $6.53 billion are potentially accessible to private capital. The largest needs include approximately $2 billion for wagon fleet renewal, acquisition of more than 450 locomotives, around $1 billion for the Caspian fleet, dry ports and road approaches. Wagon renewal is particularly important: the Bank estimates that around 60% of the fleet needs replacement.
Thus, a significant share of economic opportunities extends beyond construction of main lines. It is concentrated in segments accessible to manufacturers, logistics operators, service providers and private investors. This will require projects with clear demand, returns and allocation of responsibilities.
What the calculations do not capture
The GTAP model does not capture all the long-term consequences of corridor development. For example, it does not model new industries emerging near terminals, concentration of suppliers and customers, or productivity gains from new business relationships. These are precisely the effects that motivate countries to develop industrial and logistics zones.
The corridor also redistributes trade, and not all routes benefit equally. According to the World Bank, expansion of regional trade in some countries is accompanied by a reduction in certain external shipments. Outcomes must therefore be assessed in terms of economic structure and types of activity, rather than total transit freight alone.
For Kazakhstan, the main question can now be formulated in practical terms: which industries can use transport infrastructure to expand their own production and exports? Cheaper imported equipment, increased agricultural shipments, metal processing, transport equipment manufacturing and development of logistics businesses are different channels of the same process. The more effectively they can be connected, the greater the Middle Corridor's economic impact beyond the transport industry itself.
Based on: Alam M. M., Blancas L. C. Integration: World-Class Trade Logistics Along the Trans-Caspian Transport Corridor. World Bank, 2026. CC BY 3.0 IGO licence. The translation and interpretation were prepared by TALAP and are not official World Bank materials.